A new concept, successfully tested and delivered on time.
This was the first of our housings to be made from Rigid Polyurethane, the contract was for seventeen boxes to be used in an Upending Control Center,
the equipment inside them aided the installation of a 'Jacket' (the underwater structure supporting an Oil rig) sited in the Caspian Sea.